DOMESTIC CONTRACTING SERVICES

We are shaping the future with modern construction techniques integrated into the developing world. Accordingly, we implement the understanding of trust, equipment and aesthetics in the projects we realize.

100th Year Interchange Construction

Project Features

Construction of intersecting reinforced concrete bored pile system, prestressed prefabricated beams, consisting of all infrastructure manufacturing, variable traffic signs, all tunnel and road lighting, LV / MV electricity displacement works, landscaping works, road (including pavement and curbs) and reinforced concrete bridge intersection.

Construction of 9.196,00 m reinforced concrete bored piles with 120 cm diameter, 320,00 m reinforced concrete bored piles with 80 cm diameter, 4.065,00 m concrete bored piles with 80 cm diameter, 8.034,00,00 m jet grouting with 80 cm diameter.

490 meters long underpass with 2+2 lanes.

15 meters long canal crossing with 1+1 lane.

6.78 km of road works.

19,250,000 m3 concrete.



NATA


Location
Menemen - IZMIR


Date
2023 - 2024

Kesikköprü Dam
Water Supply and Transmission Center Between İvedik Water Treatment Plant

Project Features

Necessary pumps for pump stations.

Electric motors (1200 kW, 1600 kW, 2000 kW).

Electrical materials and equipment.

Supply of SCADA system.

Supply and installation of machinery, fixtures and equipment.

Pump stations, reinforced concrete warehouses.(7500 m3, 15.000 m3, 30.0000 m3)

Construction works of water intake structure, valves, suction cups and discharge chambers on the line.



NATA


Location
ANKARA


Date
2007 - 2008

Ataturk Boulevard
Kuğulu Interchanges

Project Features

Bored pile system, pre-stressed prefabricated beam, all infrastructure manufacturing, variable traffic sign, traffic signaling system, all tunnel and road lighting, LV/MV electrical displacement works, telecom infrastructure displacement (including copper cable, fiberoptic cable, cable TV works) , natural gas displacement (low and medium pressure) works, landscaping works, road (including pavement and border) and reinforced concrete bridge junction construction were carried out.



NATA


Location
Çankaya - ANKARA


Date
2003 - 2006

Asian Side
Jacking Method and Various Waste Water Collectors

Project Features

Micro-tunnel with a diameter of 1400 mm with the construction technique of 4.172 m pipe-jacking.


Çamlıdere Dam
Raw Water Transmission Line Between İvedik Treatment Plant

Project Features

60.000 m3 reinforced concrete water tank.

Spiral with an internal diameter of 2000 mm and a length of 36.0000 m supply and laying of welded steel pipes.

Reinforced concrete engineering structures, supply and installation of machinery armature equipment and cathodic protection.



NATA


Location
ANKARA


Date
2000 - 2004